Station Contract Packages

Each location uses the same multi-activity design and the same set of 15 work-package contracts (build + operate: civil, power, structure, battery, ops labour, supplies, multi-activity, water, food, staffing, utilities, security, medical, waste, insurance) plus master — with full labour and supply line items.

Package contents (identical structure every station):

  • CIVIL — Civil Works & Pad Construction
  • POWER — Electrical Power — Temporary & Permanent
  • STRUCT — Shelter, Restroom & Services Core
  • BATTERY — Battery Swap Cage & Packs Logistics
  • LABOUR-OPS — Operations Labour (Build-to-Ops Transition)
  • SUPPLY-GEN — General Supplies & Consumables (12 months)
  • MULTI — Multi-Activity Fit-Out (Agri & Construction Bays)
  • WATER — Water Supply & Sanitation Services
  • FOOD — Staff & Visitor Food Provisions Contract
  • STAFF-OPS — Station Staffing & Payroll Support Contract
  • UTIL — Utilities — Power Top-Up, Comms & Data
  • SEC — Site Security & Access Control
  • MED — Occupational Health & First Response
  • WASTE — Waste, Recycling & Hazardous Materials
  • INSURE — Insurance & Compliance Retainers
  • MASTER — umbrella development agreement
Timeline simulator
StationCountryBuild phase%Open full package
Australia Hub 6 Australia P2 Civil works — pad foundation 20% View all contracts →
Australia Hub 7 Australia P3 Temporary power & limited ops enablement 34% View all contracts →
Australia Hub 8 Australia P4 Superstructure — shelter & services core 49% View all contracts →
Australia Hub 9 Australia P5 Permanent power, charge & swap fit-out 63% View all contracts →
Australia Hub 10 Australia P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Australia Hub 11 Australia P7 Snagging, certification & full operations handover 91% View all contracts →
Australia Hub 12 Australia P1 Mobilisation & site survey 6% View all contracts →
Australia Hub 13 Australia P2 Civil works — pad foundation 20% View all contracts →
Australia Hub 14 Australia P3 Temporary power & limited ops enablement 34% View all contracts →
Australia Hub 15 Australia P4 Superstructure — shelter & services core 49% View all contracts →
Australia Hub 16 Australia P5 Permanent power, charge & swap fit-out 63% View all contracts →
Australia Hub 17 Australia P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Australia Hub 18 Australia P7 Snagging, certification & full operations handover 91% View all contracts →
UAE Hub 1 UAE P1 Mobilisation & site survey 6% View all contracts →
UAE Hub 2 UAE P2 Civil works — pad foundation 20% View all contracts →
UAE Hub 3 UAE P3 Temporary power & limited ops enablement 34% View all contracts →
UAE Hub 4 UAE P4 Superstructure — shelter & services core 49% View all contracts →
UAE Hub 5 UAE P5 Permanent power, charge & swap fit-out 63% View all contracts →
UAE Hub 6 UAE P6 Finishes, signage & dual-use optimisation 77% View all contracts →
UAE Hub 7 UAE P7 Snagging, certification & full operations handover 91% View all contracts →
UAE Hub 8 UAE P1 Mobilisation & site survey 6% View all contracts →
UAE Hub 9 UAE P2 Civil works — pad foundation 20% View all contracts →
UAE Hub 10 UAE P3 Temporary power & limited ops enablement 34% View all contracts →
UAE Hub 11 UAE P4 Superstructure — shelter & services core 49% View all contracts →
UAE Hub 12 UAE P5 Permanent power, charge & swap fit-out 63% View all contracts →

Page 78 / 87 · Prev · Next