Station Contract Packages

Each location uses the same multi-activity design and the same set of 15 work-package contracts (build + operate: civil, power, structure, battery, ops labour, supplies, multi-activity, water, food, staffing, utilities, security, medical, waste, insurance) plus master — with full labour and supply line items.

Package contents (identical structure every station):

  • CIVIL — Civil Works & Pad Construction
  • POWER — Electrical Power — Temporary & Permanent
  • STRUCT — Shelter, Restroom & Services Core
  • BATTERY — Battery Swap Cage & Packs Logistics
  • LABOUR-OPS — Operations Labour (Build-to-Ops Transition)
  • SUPPLY-GEN — General Supplies & Consumables (12 months)
  • MULTI — Multi-Activity Fit-Out (Agri & Construction Bays)
  • WATER — Water Supply & Sanitation Services
  • FOOD — Staff & Visitor Food Provisions Contract
  • STAFF-OPS — Station Staffing & Payroll Support Contract
  • UTIL — Utilities — Power Top-Up, Comms & Data
  • SEC — Site Security & Access Control
  • MED — Occupational Health & First Response
  • WASTE — Waste, Recycling & Hazardous Materials
  • INSURE — Insurance & Compliance Retainers
  • MASTER — umbrella development agreement
Timeline simulator
StationCountryBuild phase%Open full package
Senegal Hub 7 Senegal P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Senegal Hub 8 Senegal P7 Snagging, certification & full operations handover 91% View all contracts →
Senegal Hub 9 Senegal P1 Mobilisation & site survey 6% View all contracts →
Senegal Hub 10 Senegal P2 Civil works — pad foundation 20% View all contracts →
Senegal Hub 11 Senegal P3 Temporary power & limited ops enablement 34% View all contracts →
Senegal Hub 12 Senegal P4 Superstructure — shelter & services core 49% View all contracts →
Senegal Hub 13 Senegal P5 Permanent power, charge & swap fit-out 63% View all contracts →
Senegal Hub 14 Senegal P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Senegal Hub 15 Senegal P7 Snagging, certification & full operations handover 91% View all contracts →
Senegal Hub 16 Senegal P1 Mobilisation & site survey 6% View all contracts →
Senegal Hub 17 Senegal P2 Civil works — pad foundation 20% View all contracts →
Senegal Hub 18 Senegal P3 Temporary power & limited ops enablement 34% View all contracts →
Senegal Hub 19 Senegal P4 Superstructure — shelter & services core 49% View all contracts →
Senegal Hub 20 Senegal P5 Permanent power, charge & swap fit-out 63% View all contracts →
Senegal Hub 21 Senegal P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Senegal Hub 22 Senegal P7 Snagging, certification & full operations handover 91% View all contracts →
Senegal Hub 23 Senegal P1 Mobilisation & site survey 6% View all contracts →
Senegal Hub 24 Senegal P2 Civil works — pad foundation 20% View all contracts →
Senegal Hub 25 Senegal P3 Temporary power & limited ops enablement 34% View all contracts →
Senegal Hub 26 Senegal P4 Superstructure — shelter & services core 49% View all contracts →
Senegal Hub 27 Senegal P5 Permanent power, charge & swap fit-out 63% View all contracts →
Senegal Hub 28 Senegal P6 Finishes, signage & dual-use optimisation 77% View all contracts →
Seychelles Hub 1 Seychelles P7 Snagging, certification & full operations handover 91% View all contracts →
Seychelles Hub 2 Seychelles P1 Mobilisation & site survey 6% View all contracts →
Seychelles Hub 3 Seychelles P2 Civil works — pad foundation 20% View all contracts →

Page 51 / 87 · Prev · Next