Station Contract Packages
Each location uses the same multi-activity design and the same set of 15 work-package contracts (build + operate: civil, power, structure, battery, ops labour, supplies, multi-activity, water, food, staffing, utilities, security, medical, waste, insurance) plus master — with full labour and supply line items.
Package contents (identical structure every station):
- ◆ CIVIL — Civil Works & Pad Construction
- ◆ POWER — Electrical Power — Temporary & Permanent
- ◆ STRUCT — Shelter, Restroom & Services Core
- ◆ BATTERY — Battery Swap Cage & Packs Logistics
- ◆ LABOUR-OPS — Operations Labour (Build-to-Ops Transition)
- ◆ SUPPLY-GEN — General Supplies & Consumables (12 months)
- ◆ MULTI — Multi-Activity Fit-Out (Agri & Construction Bays)
- ◆ WATER — Water Supply & Sanitation Services
- ◆ FOOD — Staff & Visitor Food Provisions Contract
- ◆ STAFF-OPS — Station Staffing & Payroll Support Contract
- ◆ UTIL — Utilities — Power Top-Up, Comms & Data
- ◆ SEC — Site Security & Access Control
- ◆ MED — Occupational Health & First Response
- ◆ WASTE — Waste, Recycling & Hazardous Materials
- ◆ INSURE — Insurance & Compliance Retainers
- ◆ MASTER — umbrella development agreement
| Station | Country | Build phase | % | Open full package |
|---|---|---|---|---|
| Nigeria Hub 28 | Nigeria | P1 Mobilisation & site survey | 6% | View all contracts → |
| Nigeria Hub 29 | Nigeria | P2 Civil works — pad foundation | 20% | View all contracts → |
| Nigeria Hub 30 | Nigeria | P3 Temporary power & limited ops enablement | 34% | View all contracts → |
| Nigeria Hub 31 | Nigeria | P4 Superstructure — shelter & services core | 49% | View all contracts → |
| Nigeria Hub 32 | Nigeria | P5 Permanent power, charge & swap fit-out | 63% | View all contracts → |
| Nigeria Hub 33 | Nigeria | P6 Finishes, signage & dual-use optimisation | 77% | View all contracts → |
| Nigeria Hub 34 | Nigeria | P7 Snagging, certification & full operations handover | 91% | View all contracts → |
| Nigeria Hub 35 | Nigeria | P1 Mobilisation & site survey | 6% | View all contracts → |
| Nigeria Hub 36 | Nigeria | P2 Civil works — pad foundation | 20% | View all contracts → |
| Nigeria Hub 37 | Nigeria | P3 Temporary power & limited ops enablement | 34% | View all contracts → |
| Nigeria Hub 38 | Nigeria | P4 Superstructure — shelter & services core | 49% | View all contracts → |
| Nigeria Hub 39 | Nigeria | P5 Permanent power, charge & swap fit-out | 63% | View all contracts → |
| Nigeria Hub 40 | Nigeria | P6 Finishes, signage & dual-use optimisation | 77% | View all contracts → |
| Rwanda Hub 1 | Rwanda | P7 Snagging, certification & full operations handover | 91% | View all contracts → |
| Rwanda Hub 2 | Rwanda | P1 Mobilisation & site survey | 6% | View all contracts → |
| Rwanda Hub 3 | Rwanda | P2 Civil works — pad foundation | 20% | View all contracts → |
| Rwanda Hub 4 | Rwanda | P3 Temporary power & limited ops enablement | 34% | View all contracts → |
| Rwanda Hub 5 | Rwanda | P4 Superstructure — shelter & services core | 49% | View all contracts → |
| Rwanda Hub 6 | Rwanda | P5 Permanent power, charge & swap fit-out | 63% | View all contracts → |
| Rwanda Hub 7 | Rwanda | P6 Finishes, signage & dual-use optimisation | 77% | View all contracts → |
| Rwanda Hub 8 | Rwanda | P7 Snagging, certification & full operations handover | 91% | View all contracts → |
| Rwanda Hub 9 | Rwanda | P1 Mobilisation & site survey | 6% | View all contracts → |
| Rwanda Hub 10 | Rwanda | P2 Civil works — pad foundation | 20% | View all contracts → |
| Rwanda Hub 11 | Rwanda | P3 Temporary power & limited ops enablement | 34% | View all contracts → |
| Rwanda Hub 12 | Rwanda | P4 Superstructure — shelter & services core | 49% | View all contracts → |